The requirements that you should provide is:
Then you can do:
Contact the nearest Service Office (see service area)
Prepare all files that have been mentioned in the above point
The officer will contact/visit to survey the location and retrieval of document requirements have you prepare
At the time officers visit you and process the next new connection can be made, sign a waiver and the Willingness that has been provided. Within 5 working days at the latest after registration requirements and equipped, our officers will perform the installation of the connection pipes and water meters in your home (if available pipelines around your House)
Bring all the files that have been mentioned in point above, fill in your details on the application provided at the Service Office, the officer will conduct a survey to your location. At the time officers visit you and process a new connection can be made, sign a waiver and Promissory provided within at least 5 working days after registration requirements and equipped, our officers will perform the installation of the connection pipes and water meters in your home (if available pipelines around your House)
Determination of Classes/groups rates are based on:
For more information you can contact our operators.